Every winter, China puts manufacturing and exports on hold for almost a month. In 2027, Chinese New Year falls on February 6. This is 11 days earlier than in 2026 (February 17), meaning all deadlines are shifting accordingly. If your goods need to arrive by February or March, you must plan your shipment now, in November.

When Is the holiday and how long Is the pause?

• February 6, 2027 (Saturday): Chinese New Year

• February 5–12: Official public holidays in China

• February 20: Lantern Festival, the unofficial end of the festive period

According to the calendar, the holiday lasts only a week, but in reality, the pause is much longer. Factories begin slowing down as early as mid-January as workers travel back to their hometowns. They only return to full capacity at the end of February or early March. In total, this accounts for 4 to 6 weeks of lost production. The same applies to Vietnam, where the local New Year (Tết) also falls on February 6.

Why this season will be more challenging

Rates are already rising. Shipping lines are increasing freight rates from Asia to Europe and the Mediterranean starting in December. Carriers are doing this to establish a higher rate baseline ahead of the 2027 annual contract negotiations.

Space is tighter. In late November, shipping lines are canceling a number of sailings (blank sailings) from the Far East to Europe, resulting in an existing shortage of vessel space to Gdańsk and Constanța.

Ramadan overlaps with the New Year. It will run from February 8 to March 9, 2027. Consignees in the Middle East and the Mediterranean want to receive their goods before it begins, driving shipping demand in December and January even higher.

As a result, from mid-December to late January, all importers are shipping simultaneously. Rates go up, space runs out, and any cargo that fails to depart before the holiday gets stuck waiting until March.

Planning Calendar

November – Early December: Place orders with suppliers and request the factory's holiday operating schedule.

• December: Book vessel space for December and January sailings.

• By Mid-January: Cargo is ready and dispatched from the factory.

• February 5–12: Official holidays in China; virtually no shipments take place.

• Late February – March: Production gradually resumes; confirm new cargo readiness dates.

Practical Tips from GRANDAR

Ask your factory for four key dates: the last day to accept orders, the last day of production, the last dispatch date, and the date operations resume. A general holiday calendar cannot replace your specific supplier's schedule.

Book space in advance. The earlier you book, the higher your chances of securing vessel space and, typically, locking in a lower rate.

Build up buffer stock. If you need goods on a regular basis, plan your inventory levels to last until April.

Inspect quality after the holidays. Factory staff turnover is common in China after the New Year, so initial post-holiday batches require closer quality control.

Consider alternative routes. If space to one port is sold out, compare other options: Gdańsk, Constanța, and other hubs with subsequent delivery to Ukraine.

How GRANDAR Can Help

The GRANDAR team handles container shipping from China every day. We will:

• calculate the optimal route and rate from Chinese ports (Shanghai, Ningbo, Yantian, Nansha, and others) to Gdańsk, Constanța, and other ports, including final delivery to your warehouse;

• help you secure vessel space for December and January while availability lasts;

• oversee loading and door-to-door delivery.

Don't put off planning until January—by then, it will be too late. Message us today, and we will find the best solution for your cargo.